Casino Industrial Estate

PROJECT DETAILS
  • Contract: Design & Construct
  • Client: SGJ Investments
  • Tenant: TBC
  • Superintendent: SGJ Investments

Capstone Construction have been engaged under a D&C contract to master plan the five stage redevelopment of the existing industrial facility in Welshpool. Stage one involves demolition of existing structures, upgrading, and redesigning site wide infrastructure and construction of a 5,000m2 warehouse with recessed loading docks and office building.

The facility has been designed with the ability to convert into a workshop with dual 20T cranes and combined 40T lift capacity. Estate pumps and tanks have also be provisioned along with electrical infrastructure to support the overall redevelopment.

Works have commenced on site and are due for completion in June 2021.